A $100 risk budget and a 20-point MNQ stop allow two contracts before costs. Add an assumed $4 round-trip fee and $2 execution reserve per contract, and those two contracts use $92. A third would use $138. The stop has stayed in the same place; the quantity changes to fit the budget.
This position sizing calculator divides a chosen risk budget by the estimated loss per unit, then rounds the quantity down to the permitted increment. Enter costs in the same currency as the budget. Check the resulting quantity against your platform limits, available margin and remaining account loss allowance.
Position sizing calculator with fees and slippage
Use the default MNQ example to see the calculation, then replace its assumptions. Risk budget is the amount allocated to this proposed trade. Stop distance is measured in points, pips or another declared price unit. Value per price unit converts that distance into money for one contract, lot, share or coin.
Use one account currency for all money inputs. The default is a hypothetical MNQ example. This tool has no market-price or account connection.
Quantity: 2 contracts in the default example. Estimated loss per unit: 46.00; total estimated loss: 92.00; unused budget: 8.00.
Money results use your input currency and round to two decimals. A nonzero value below 0.01 is labelled <0.01. Quantity is rounded down to the entered step. Inputs are not submitted and no order is placed.
The cost fields are per one full unit for the complete entry and exit. If a futures schedule quotes a fee per contract per side, include both sides. If you enter a cost per standard forex lot, keep the value field and quantity step in standard lots too. This calculator scales the entered costs linearly with quantity.
The optional quantity cap represents a separate limit you already know, such as one remaining contract of capacity. It does not discover your provider's rules. Leave it blank when you have no additional quantity cap to apply. A cap on cash committed to shares must first be converted into shares using the proposed entry price and any relevant purchase costs.
Position sizing formula: divide by the whole loss per unit
The formula begins with the money lost on one unit if the planned stop fills at its assumed price. Add the costs associated with opening and closing that unit, plus any separate execution reserve. The quantity is the available trade budget divided by that complete amount.
Estimated loss per unit = stop distance × value per price unit + round-trip cost per unit + execution reserve per unit.
Raw quantity = risk budget ÷ estimated loss per unit. Apply the quantity increment, minimum and optional cap after this division. The output can be lower than the raw result; rounding up would consume money that was never included in the budget.
If the candidate budget changes after each completed trade, the anti-Martingale strategy guide compares halving after a loss with resetting to the initial risk. It also shows why current loss headroom and whole-contract rounding can override a proposed increase.
Keep the denominator together. With $100, a 20-point stop and $2 per point, the calculation before costs is 100 ÷ (20 × 2) = 2.5 contracts. Calculating 100 ÷ 20 × 2 instead produces 10 contracts and a very different position. The brackets carry a practical consequence when you enter an order.
For the default cost-inclusive example, the denominator is 20 × $2 + $4 + $2 = $46. Dividing $100 by $46 gives about 2.1739. Whole-contract rounding reduces this to two contracts. Estimated loss is then 2 × $46 = $92, leaving $8 of the selected budget unused.
Choose the stop distance before changing the quantity
The stop belongs at the price where your planned trade is invalidated, using the setup's own conditions. Measure from the proposed entry to that price. CME's position-sizing lesson starts with a logical stop and the amount of capital allocated to risk. Changing quantity lets you preserve that stop while adjusting the money exposed. The trailing stop examples separate initial risk from the distance used after activation, so a later trail can be evaluated against the original sizing decision.
For a hypothetical long entry at 20,000 with a stop at 19,980, the distance is 20 points. A short entry at 20,000 with a stop at 20,020 also has a 20-point distance. A short stop below the entry needs another explanation; simply taking an absolute value would conceal a direction error.
Once the quantity fits, compare the target with the stop and costs using the risk reward ratio calculator. That tool answers a different question: what the planned win and loss look like for a quantity you have chosen. A favourable ratio cannot increase the amount your account can afford to lose.
A very tight stop can produce a large mathematical quantity. Check whether that distance still represents the original setup and the instrument's normal price movement. Moving the stop to make a larger quantity appear affordable changes the trade rather than solving the original sizing problem.
Match points, ticks, pips and account currency
Distance and value must describe the same movement. For MNQ, CME's contract specifications give a $2 index-point multiplier and a 0.25-point minimum tick. One tick is therefore $0.50 per contract. A 20-point stop is 80 ticks; either 20 × $2 or 80 × $0.50 gives $40 before costs.
Entering 20 as points and $0.50 as the tick value would understate that risk fourfold. Enter 20 with 2 in this calculator, or convert both fields into ticks consistently. Confirm the product and contract specification before transferring a number from another chart.
For MGC, use $10 per full quoted price point and whole contracts. The Micro Gold futures guide works through its tick value, an eight-point stop and the difference between margin and trade risk.
For a share quoted in dollars, a one-dollar move changes the value of one share by one dollar, so the value input is 1. For forex, you can use pips and the account-currency value of one pip per standard lot. A USD account trading EUR/USD with a 100,000-unit standard lot has a $10 value per pip (a 0.0001 price move), before trading costs.
That $10 does not apply to every currency pair. With USD/JPY hypothetically at 150, one pip on a 100,000-unit lot is ¥1,000, approximately $6.6667 at that conversion rate. If using that approximation, document it and refresh the rate when necessary. The calculator does not fetch prices or exchange rates.
Convert the risk budget, value, fees and reserve into the same currency. A TWD budget divided by USD contract risk produces a misleading quantity. If you need automatic currency conversion, the public Myfxbook position size calculator provides pair and account-currency inputs; verify its assumptions against your own instrument specification.
Round position size down, including the zero result
Futures contracts generally require whole-number quantities, so use a step and minimum of 1 for the examples here. If the raw answer is 2.17, the executable planning result is 2. If the budget is $40 while one cost-inclusive contract requires $46, the output is 0. Increasing the answer to one contract would exceed the declared budget. The MES vs ES risk example shows how an 8-point stop and assumed round-trip costs produce different whole-contract results on the same $100 budget.
Fractional quantities require the increment supported by the instrument. Suppose a hypothetical forex trade has a 25-pip stop, $10 pip value per standard lot and $10 combined cost and reserve per standard lot. One lot uses $260 of estimated risk. With a $100 budget and 0.01-lot steps, 0.38 lots use $98.80; 0.39 lots would use $101.40.
This calculator treats valid quantities as multiples of the entered step, measured from zero, and then checks the minimum. If your broker defines a different permitted quantity grid, follow its specification. Minimum and step are separate inputs: an instrument can have a minimum larger than one increment.
| Hypothetical inputs | Loss per full unit | Quantity after rounding | Estimated loss |
|---|---|---|---|
| $100 budget; MNQ 20 points; $2/point; $6 combined costs | $46 | 2 contracts | $92 |
| $40 budget; same MNQ assumptions | $46 | 0 contracts | $0 |
| $100 budget; 25 pips; $10/pip/lot; $10 costs/lot; step 0.01 | $260 | 0.38 lots | $98.80 |
| $100 budget; $2 share-price stop; $0.05 combined costs/share | $2.05 | 48 shares | $98.40 |
All fees and reserves in this table are assumptions for arithmetic, rather than a provider's current fee schedule. Apply the actual minimum, increment and charges for your account. The zero result leaves the proposed setup unfunded by that budget; it does not instruct you to alter the stop.
Use a linear crypto quantity without confusing it with liquidation
For a spot or linear crypto example, declare the coin quantity and quote currency explicitly. Suppose a hypothetical BTC trade enters at 60,000 USDT and has a stop at 59,500 USDT. One BTC has 500 USDT of price risk. With an assumed 5 USDT round-trip fee and 10 USDT execution reserve per BTC, the model uses 515 USDT per BTC.
A 100 USDT budget and a 0.001 BTC increment give 0.194 BTC, with 99.91 USDT of estimated loss. The value field is 1 because a one-USDT price movement changes the value of one BTC by one USDT in this linear example. Keep all other money inputs in USDT too; the calculation does not establish an exchange rate between USDT and dollars.
Check the venue's actual quantity increment and fee method. Funding charges depend on the instrument and holding period and need their own assumptions. An inverse contract uses a different payoff calculation, while liquidation depends on margin, collateral, maintenance requirements and the venue's rules. This stop-based quantity result does not calculate or verify a liquidation price.
Include costs once and keep the execution reserve visible
Use the complete round-trip commission and applicable transaction fees for one entered quantity unit. A $2 per-side contract fee becomes $4 for an entry and exit. For a multi-contract trade, the calculator multiplies that per-contract amount by the resulting quantity.
Minimum ticket fees, tiered commissions and financing charges may not scale this way. A share trade with a flat minimum charge needs a separate whole-trade calculation. Fixed subscriptions and evaluation purchases are also different from incremental execution costs. Keep those in your broader cost plan instead of treating every fee as proportional to contract count.
The reserve is an explicit assumption about a worse execution outcome. If it is $2 per MNQ, the default example allows one extra adverse index point per contract. A fast market can move further. When reviewing completed trades, actual entry and exit fills already reflect the execution difference; subtracting that same difference again would double-count it.
Spread needs the same care. If the entry and stop assumptions already use the prices at which each side could execute, adding the same spread again overstates the modelled loss. Decide which execution costs are embedded in price and which belong in the separate fields before comparing two setups.
Set a prop firm budget from the remaining loss allowance
A nominal 50K account does not give you $50,000 of disposable loss capacity. Begin with the currently applicable account value and the loss threshold that is monitored at that moment. For an equity-monitored rule, open losses can reduce the remaining distance before you close anything.
Consider a hypothetical account with equity of $50,600 and a monitored threshold of $50,100. The distance is $500. Suppose its remaining daily allowance is $260. You also allocate $60 for additional losses on existing positions and retain $100 of unused room. Under those assumptions, a new $100 trade budget uses the tighter daily constraint: $260 − $60 − $100 = $100.
The quantities are planning assumptions, and the remaining allowance must be measured on a consistent basis. Current equity already includes current floating P&L. When subtracting existing-position risk, estimate the additional loss from current prices to their planned exits, with relevant costs, rather than subtracting the same floating loss again.
Check when the threshold updates and whether touching it is a breach. The EOD drawdown guide explains why an end-of-day threshold update can coexist with an intraday equity check. A calculated budget that uses every remaining dollar leaves no room for costs, price gaps or a boundary-touch rule.
An account may also have a separate daily loss limit, contract scaling rule or instrument restriction. Enter an independently verified quantity cap if it applies. The calculator has no connection to those account controls and cannot certify that an order is permitted.

Compare HDP discounts
Lucid 30% · Tradeify 30% · TPT 50%.
See current offers ↗Eligible partner plans only.
Check contract limits, buying power and margin separately
A risk-based quantity can fit the stop budget while failing another constraint. If the calculator returns two contracts but only one contract of capacity remains under your account's current rules, the optional cap reduces the result to one. The default example would then use $46 of estimated risk, leaving $54 of the chosen budget unused.
For an unlevered stock purchase, also compare the cash required. The table's 48-share result assumes a $2 stop distance and $0.05 of proportional costs per share. At a hypothetical $50 entry, the shares alone require $2,400. If your separate allocation allows only $1,000 for shares, twenty shares fit that allocation before any purchase charges.
Schwab's trade-planning example separates the capital committed to a position from the amount exposed between entry and exit. Keep those numbers distinct in your own plan. A margin requirement controls what you can open or maintain; it does not turn a price move into a smaller dollar loss.
The MNQ vs NQ comparison shows how a smaller contract changes quantity increments and commission economics. A smaller instrument can make a proposed stop fit the budget more closely, provided your platform and account allow that instrument.
Include other positions and copied accounts
Calculating each ticket independently can hide the amount exposed to one market move. Two hypothetical positions with $80 of further stop risk each can create $160 of combined exposure before additional execution differences. Different symbols do not make their outcomes independent, especially when the trades express the same directional idea.
For an addition to an existing position, recalculate the combined outcome. Moving the original stop to entry still leaves fees, execution uncertainty and the new position's loss. A gross breakeven label does not make the whole idea risk-free.
Copied accounts require their own checks. Two accounts can have the same nominal size while carrying different equity, remaining drawdown, positions or contract permissions. A quantity that fits the leader may exceed a follower's allowance. Calculate each account's usable budget and capacity before deciding what the copier should send.
Fixed cash, fixed percentage and volatility-adjusted sizing
A fixed-cash method chooses a dollar budget, such as the hypothetical $100 used here, and varies quantity with stop distance. A fixed-percentage method recalculates the budget from current eligible equity. For example, 1% of $10,000 is $100; 1% of $9,000 is $90. The percentage is a chosen assumption, not a universal risk recommendation.
Repeated percentage losses compound. Ten losses of 2% of the equity remaining before each trade leave 0.98 to the tenth power, approximately 81.707% of the starting amount. The drawdown is about 18.293%, before other charges. Ten fixed losses of $200 from a $10,000 start instead leave $8,000. Stating the sizing method avoids confusing those two histories.
Volatility-adjusted sizing changes the distance used in the risk calculation. If a volatility-based stop doubles while the money budget stays the same, the raw quantity falls; rounding and costs can make the final change uneven. Keep the stop rule consistent with the tested setup. A volatility measure cannot decide how much account loss you personally can withstand. The Average True Range guide works through a volatility-based stop, tick rounding and the resulting MNQ quantity.
After the trade, record the chosen budget, calculated quantity, planned stop, actual fills and costs in the prop firm trading journal. Compare the estimate with the realised result. That comparison helps identify whether the difference came from size, a changed exit, fees or execution.
Position sizing calculator FAQ
Is this position sizing calculator free?
Yes. It runs on this page without a login or connection to a trading account. Inputs are used for the calculation and are not submitted by the calculator.
Should risk budget equal my account balance?
Enter the amount allocated to the proposed trade. If using an equity percentage, calculate that amount first. For a prop firm, also check remaining loss allowance, existing-position risk and account limits.
Why does the calculator return zero contracts?
The budget or optional cap does not accommodate the minimum quantity on the entered step. With $40 available and $46 estimated loss per contract, one contract exceeds the budget, so the planning quantity is zero.
Do I enter points or ticks for MNQ?
Either works when the value field uses the same unit. MNQ has a $2 value per full index point and $0.50 per 0.25-point tick. A 20-point stop is 80 ticks.
Are fees entered per side or round trip?
Enter the complete entry-and-exit cost for one full quantity unit. Convert a per-side schedule to round trip first, and check whether any minimum charge makes linear scaling inappropriate.
Can I enter a 0.01-lot forex increment?
Yes. Use the value and costs per standard lot, then enter 0.01 as the step if permitted by your broker. Confirm the minimum and valid quantity grid separately.
Does the calculator convert account currencies?
No. Convert the budget, price-unit value, fees and reserve into one currency before entering them. Cross-currency pip values can change with the conversion rate.
Can it calculate XAUUSD lots?
It can calculate a linear quantity when you supply the correct contract size, price-unit value, account-currency conversion and lot increment. Check your broker's gold specification rather than borrowing a forex pip value.
Does selecting more leverage increase the result?
Leverage is not an extra multiplier in this stop-risk formula. Check margin and liquidation conditions separately; they may impose a smaller permitted quantity or different risks.
Does a calculated size guarantee my maximum loss?
No. The result assumes the entered stop distance and costs. Gaps, liquidity changes, execution delays and other conditions can produce a larger realised loss.
Can I use the result for options or inverse crypto contracts?
The calculator assumes a fixed linear money value per price unit. Options and inverse contracts can require different valuation formulas. Use an instrument-appropriate model instead.
Is this an MT5 position sizer download?
No. This is a browser calculation tool. An MT5 EA or indicator has separate installation, permissions and instrument settings; this page does not install software or send orders.
How do I use the optional quantity cap?
Enter the remaining quantity capacity you have independently verified. The calculator applies the smaller of the budget-based quantity and that cap, then rounds down to the chosen step.
What should I check before transferring the quantity to a platform?